How we build a single-family home, step by step. Typical time frame: 7–9 months.
Phase 1
Plan & Permit
Step 1
01
Design, Permitting and Utilities
Phase 2
Foundation
Steps 2–5
02
Excavation – Digging the Basement
03
Foundation – Installation of Basement footings and walls
04
Waterproofing and Foundation Insulation
05
Backfill & Setting Structural Steel
Phase 3
Framing & Exterior
Steps 6–11
06
Framing – Rough Carpentry – “Cap” the Basement, and Frame walls, Roof, Etc.
07
Roofing – Install roofing shingles
08
Install Windows and Exterior Doors
09
Siding & Masonry Veneer – Install veneer facing materials such as siding and stone or brick
10
Exterior Painting
11
Gutters and Downspouts
Phase 4
Mechanicals & Insulation
Steps 12–14
12
Rough Mechanicals – Installation of plumbing water and waste lines, HVAC ductwork and exhaust vents, electrical wiring & equipment such as ceiling cans, and pre-manufactured fireplaces
13
Pour Basement and Garage floors, Installation of utilities – gas, electric, S&W
14
Insulation – Fill the walls with insulation blankets, spray foam, or blown products to achieve the required R-Values, and moisture controlling membranes.
Phase 5
Interior Finishes
Steps 15–22
15
Drywall – Install gypsum wall board (GWB) to all ceilings and walls
16
Texture, prime and paint interior wall and ceiling surfaces
17
Install hardwood flooring, cabinetry, doors and millwork including stair parts, beams, mantels, etc.
18
Interior Painting – paint doors and trim (millwork)
19
Counter-Tops – Install counter-tops
20
Finish Mechanicals – Install plumbing, electrical and HVAC fixtures and equipment
21
Finish Hardwood Floors, or install prefinished flooring
22
Install Appliances, central vac, alarm & audio equipment
Phase 6
Final Steps & Move-In
Steps 23–26
23
Clean and Carpet – Complete all punch lists – all trades
24
Occupancy Inspection
25
Walk-through with Customer, Closing, and Warranties
26
House Becomes a Home!